How many sets of drawings are required for commercial plan review?
At least two sets of drawings with original stamp or seal by an engineer or architect with State of Ohio certification (the top sheet has to be signed). The same is required for resubmittals and revisions.

At any time if you are unsure please contact our office at (419) 213-2990.

Show All Answers

1. When do I need a building permit?
2. What do I need to obtain a residential building permit?
3. How many sets of drawings are required for commercial plan review?
4. Where can I find out information regarding post frame buildings and decks?